BASIN Database - Database Manual

Database Manual



Export to Excel   |   Print Version (Wide Table Format)
TableColumnColumn Comments
COMPLETE_SEISMIC_TRACKS  PROJECT  Project Number of the seismic survey. 
COMPLETE_SEISMIC_TRACKS  LINE  Seismic Line Number. This is the seismic line number assigned by the company. Examples: "T-14", "USGS12A". Some Line Numbers, such as "T-14" occur in more than one seismic survey. 
COMPLETE_SEISMIC_TRACKS  OACID  Operational Activity Code ID. Related to the OAC field in the COMPLETE_SEISMIC_SURVEYS table. Consists of the OAC with a number appended to it which corresponds to the line number. Example: "SAQ294" represents line number 294 in the SAQ seismic survey. This system was dropped in 1979, therefore only 97 of the hundreds of seismic surveys in the dataset have OACID numbers. 
COMPLETE_SEISMIC_TRACKS  STRT  Start Shotpoint. This is the shotpoint number at the start of the line. It can be a negative number, such as "-100". The value is usually "1". 
COMPLETE_SEISMIC_TRACKS  END  End Shotpoint. 
COMPLETE_SEISMIC_TRACKS  DIST  Distance from the start to the end shotpoints. This is the distance, in kilometers, along the line from the first to the last shotpoints. Example: "13.487". 
COMPLETE_SEISMIC_TRACKS  MIN_LAT  Minimum Latitude. The latitude of the southernmost point on the seismic line. 
COMPLETE_SEISMIC_TRACKS  MAX_LAT  Maximum Latitude. The latitude of the northernmost point on the seismic line. 
COMPLETE_SEISMIC_TRACKS  MIN_LONG  Minimum Longitude. The longitude of the westernmost point on the seismic line. 
COMPLETE_SEISMIC_TRACKS  MAX_LONG  Maximum Longitude. The longitude of the easternmost point on the seismic line. 

Choose a Table