Database Manual
Export to Excel   |   Print Version (Wide Table Format)
| Table | Column | Column Comments |
|---|---|---|
| COMPLETE_SEISMIC_TRACKS | STRT | Start Shotpoint. This is the shotpoint number at the start of the line. It can be a negative number, such as "-100". The value is usually "1". |
Choose a Table